Fiberglass Construction Process

1.  Excavation:  The pool will be dug to design specifications.  This process usually takes one day.

2.  The pool will be delivered, set, backfilled, and filled with water.

3.   The pool’s plumbing will be installed.

4.   The licensed electrician will install wiring for the pump and an electrical breaker.

5.  City Inspection.

6,  Your gas line for the heater and heater placement will run concurrently with other construction phases.

7.  The pool is now ready for peagravel backfill, which is the preparation for concrete.

8.  City Inspection.

9. Concrete Walkways can be formed and poured.  To help maintain the structural integrity of the concrete, we have installed sono tubes, peagravel, deck braces, control joints, Nycon reinforcement and 4000-PSI concrete.  However, there is a very good chance your concrete will crack.  These cracks may occur as soon as it is poured.

10. Optional: Tile and fiberoptic lighting work will be completed at this time.

11.  The rough grade will be done to insure that any water will run away from the pool.  This is not a finish grade, or ground that is ready for grass seed.

12.  The auto cover will be installed.  The box for the cover was built earlier in the pool construction.

13.  The Pool Final is next and is done by a pool technician.  Everything is cleaned, swept, and the finishing touches are completed

14.   Pool Orientation

15.   Final Inspection

 

GuildQuality Member

What Our Customers Are Saying

See More Reviews

Join our email list to receive special offers, updates and more from Pools Of Fun!

Sign Up
BAGI Builders Association of Greater Indianapolis Aqua 100 Winner GuildQuality Member - See What Our Customers Say About Our Work MIBOR Realtor Association
Order a Pool Today SWIM THIS SUMMER!

We are the largest pool builder in Indiana, and that means we have the experience and resources to get your pool completed efficiently.